Roadmap
From reproducible launch to final protocol immutability
August 10-23, 2026Planned
Devnet Rehearsal
- Finalize resumable mint, metadata, selection, wave and cumulative verification scripts.
- Run the complete devnet rehearsal: mint, three allocations, staking, maintenance and airdrop.
- Publish selection rules, program allowlist, exclusions, report format and risks.
- Correct only confirmed issues before creating mainnet assets.
August 24, 2026Planned
Mainnet Mint and Allocation
- Create the Token-2022 mint with fixed 444,444,444 SEON supply and official metadata.
- Revoke mint and freeze authorities; keep the transfer fee at 0% until staking opens.
- Allocate 440,000,000 SEON to rewards, 4,400,000 to Genesis and 44,444 to the developer.
- Publish the mint, wallets, token accounts, balances and configuration hashes.
- Fix the snapshot and prepare deterministic selection of 440 independent wallets.
August 31, 2026Planned
Staking and Wave 1
- Deploy and initialize staking after the rehearsal and mainnet checks pass.
- Open the single 7-day lock, 3-day grace and proportional rewards without guaranteed APR.
- Execute wave 1: 44 wallets x 10,000 SEON and publish its verifiable report.
- Permissionlessly activate the initial 0.02% transfer fee.
- Temporarily retain the upgrade authority for verified corrections during the ten waves.
August 31 - November 2Planned
Ten-Week Monitoring Window
- Execute one weekly wave of 44 wallets until 440 recipients and 4,400,000 SEON are complete.
- Publish recipients, signatures, failures, retries and the cumulative report for every wave.
- Publish the permissionless SEON/USDC order book on Manifest after verifying its address; it may begin empty.
- Observe staking, third-party activity, depth and price discovery without promising liquidity or value.
- Publish every staking correction with its reason, diff, tests and new verifiable address.
From November 2, 2026Planned
Final Audit and Immutability
- Verify all ten waves and publish the cumulative report covering all 440 Genesis distributions.
- Close only confirmed technical corrections from the public launch window.
- Complete the final audit and revoke critical staking authorities.
- Keep the verified Manifest address published and clearly distinguish independent, weak, high-risk and fake markets.
- Reserve no SEON for market activity, place no controlled initial orders and promise no official liquidity.
August 24: planned mint - August 31: planned staking and wave 1 - November: final audit and authority revocation